 |
 |
Robot/SCHEDULE Enterprise Takes the Tension Out of Job Schedule Audits sponsored by Help/Systems
 | White Paper: | Posted: 24 Sep 2009
| | Published: | 17 Sep 2009 | |
Summary: |
Learn how Robot/SCHEDULE, the job scheduling and batch management software for IBM AS/400, has helped companies pass their internal and external audits for over 25 years. You can monitor who changed what job, produce reports that prove you are monitoring the schedule, and demonstrate the basic security that prevents unauthorized editing of jobs.
|
|
 |
|
 |
Initial Investment Payback Analysis: Dell PowerEdge R710 solution with VMware ESX vs. Dell PowerEdge 2850 solution sponsored by Dell, Inc. and Intel
 | Test Results: | Posted: 24 Sep 2009
| | Published: | 01 May 2009 | |
Summary: |
In this report, we estimate both the number of older solutions each Dell PowerEdge R710 solution can replace and the payback period for replacing those older solutions. One key finding discovered is that each Dell PowerEdge R710 solution with VMware ESX can replace seven Dell PowerEdge 2850 solutions, and could yield a payback in under 18 months.
|
|
 |
|
 |
Initial Investment Payback Analysis: Dell PowerEdge R710 solution with Hyper-V vs. HP ProLiant DL385 solution sponsored by Dell, Inc. and Intel
 | Test Results: | Posted: 24 Sep 2009
| | Published: | 01 Mar 2009 | |
Summary: |
In this report, we estimate both the number of older solutions each Dell PowerEdge R710 solution can replace and the payback period for replacing those older solutions. Read on to learn more.
|
|
 |
|
 |
Initial Investment Payback Analysis: Dell PowerEdge R710 solution vs. HP ProLiant DL385 solution sponsored by Dell, Inc. and Intel
 | Test Results: | Posted: 24 Sep 2009
| | Published: | 01 Mar 2009 | |
Summary: |
In this report, we estimate both the number of older solutions each Dell PowerEdge R710 solution can replace and the payback period for replacing those older solutions. One key finding discovered is that each Dell PowerEdge R710 solution can replace up to nine HP ProLiant DL385 solutions, and could yield a payback in under 9 months.
|
|
 |
|
 |
Initial Investment Payback Analysis: Dell PowerEdge R710 solution with VMware ESX vs. HP ProLiant DL385 solution sponsored by Dell, Inc. and Intel
 | Test Results: | Posted: 24 Sep 2009
| | Published: | 01 May 2009 | |
Summary: |
In this report, we estimate both the number of older solutions each Dell PowerEdge R710 solution can replace and the payback period for replacing those older solutions. Read this white paper to learn more.
|
|
 |
|
 |
Virtualized OLTP workload performance comparison of end-to-end solutions: Dell vs. HP sponsored by Dell, Inc. and Intel
 | Test Results: | Posted: 24 Sep 2009
| | Published: | 01 Mar 2009 | |
Summary: |
One of the key findings discovered in this series of tests is that the Dell PowerEdge R710 server and Dell EqualLogic storage supported 22.2% more virtual machines than did the HP ProLiant DL385 G5 server and HP StorageWorks EVA 4400. Read this test report to learn more.
|
|
 |
|
 |
Consolidating Multiple Oracle OLTP Workloads on the Dell PowerEdge R710 Server sponsored by Dell, Inc. and Intel
 | White Paper: | Posted: 24 Sep 2009
| | Published: | 01 Jul 2009 | |
Summary: |
The goal of this study is to determine if a multi?node Oracle RAC cluster can be replaced with a cluster consisting of fewer Dell PowerEdge 11G nodes (powered by Intel® Xeon® processor 5500 Series), and still process the OLTP workload faster with less power consumption and lower Oracle RAC licensing fees. Read this white paper to learn more.
|
|
 |
|
 |
OLTP and Exhange Server performance summary of Intel Xeon Processor E5506, E5520, E5540, and X5550 on the Dell PowerEdge R710 Server sponsored by Dell, Inc. and Intel
 | Test Results: | Posted: 24 Sep 2009
| | Published: | 01 Apr 2009 | |
Summary: |
One key finding discovered from this test is that the Intel Xeon Processor E5520 2.26GHz-based Dell PowerEdge 710 server achieved 75.9% higher SQL Server 2008 performance than did the Intel Xeon Processor E5506 2.13GH-based Dell PowerEdge 710 server. Read this test report summary to learn more key findings.
|
|
 |
|
 |
vSphere Virtual Infrastructure Business Ready Solutions for the R610 and R710 PowerEdge Servers sponsored by Dell, Inc. and Intel
 | White Paper: | Posted: 24 Sep 2009
| | Published: | 01 Jul 2009 | |
Summary: |
This white paper presents a sample Dell solution -- using the Dell R610 and R710 PowerEdge Servers (powered by Intel® Xeon® processor 5500 Series) -- designed to tolerate faults at multiple infrastructure layers to provide maximum level of availability for the virtual infrastructure.
|
|
 |
|
 |
Making the News: Dell helps a media company maintain its competitiveness in the evolving news business, reducing the time needed to publish breaking stories by 50 percent sponsored by Dell, Inc. and Intel
 | Case Study: | Posted: 24 Sep 2009
| | Published: | 01 Feb 2008 | |
Summary: |
This case study looks at Media General a large regional communications company with over four dozen TV stations and newspapers plus an extensive online service. With the rapidly growing demand for online services and the changing online environment Media General turned to Dell for solutions.
|
|
 |
|
 |
Reaching New Heights: High-performing, clustered Workstation environment cuts energy consumption by 50 per cent sponsored by Dell, Inc. and Intel
 | Case Study: | Posted: 24 Sep 2009
| | Published: | 01 Sep 2008 | |
Summary: |
Alenia Aeronautica, an Italian aviation company, wanted to increase processing speeds so that its engineers could run complex electromagnetic equations quickly and cost-effectively. Read this case study to see what solutions Dell had to offer.
|
|
 |
|
 |
HS22 DataSheet sponsored by IBM
 | Data Sheet: | Posted: 23 Sep 2009
| | Published: | 23 Sep 2009 | |
Summary: |
IBM BladeCenter HS22 - Versatile, easy-to-use blade optimized for performance, power and cooling.
|
|
 |
|
 |
Robert Frances Group: Increasing Energy Efficiency with x86 Servers sponsored by IBM
 | White Paper: | Posted: 23 Sep 2009
| | Published: | 23 Sep 2009 | |
Summary: |
Increasing energy efficiency with x86 servers. Robert Frances Group (RFG) explains why Intel/IBM is a winning combination.
|
|
 |
|
 |
Breaking the Scalability Barrier with Infinite Cache sponsored by EnterpriseDB Corporation
 | White Paper: | Posted: 23 Sep 2009
| | Published: | 22 Sep 2009 | |
Summary: |
Infinite Cache™ from EnterpriseDB revolutionizes distributed cache management on commodity blade server hardware by substantially increasing the amount of memory available to hold data including entire databases with outstanding performance.
|
|
 |
|
 |
VMware Training Nxtbook: Reduce Your IT Costs with VMware Training sponsored by Global Knowledge
 | Training Guide: | Posted: 21 Sep 2009
| | Published: | 21 Sep 2009 | |
Summary: |
VMware vSphere is the next evolutionary step in IT computing. vSphere dramatically reduces capital and operating costs, and increases control over IT infrastructures while preserving the flexibility to choose any OS, application and hardware. Learn how to take advantage of this new technology with VMware training from Global Knowledge.
|
|
 |
|